Archives for: October 2017, 30

10/30/17

Permalink 02:53:37 pm, by mleslie Email , 94 words, 23 views   English (US)
Categories: News Updates

A new elementary school in Cambridge, Mass., aims at being a pilot for that city’s NZE commitment

by John Caulfield, Building Design & Construction- October 28, 2017 - The first Net Zero Emissions school, and the largest NZE building of any type, in Massachusetts is under construction in East Cambridge. In collaboration with William Rawn Associates, Boston-based architectural firm Arrowstreet has designed this 270,000 -sf building, which will house King Open School for grades K-5 and Cambridge Street Upper School for grades 6-8. The schools will have separate entrances as well as their own academic, physical education, and administrative facilities, but will share common spaces that will include the media center, cafeteria, and auditorium.

Build Green Schools.ca

These pages are a resource for students, parents, staff and neighbours who wish to make the buildings and yards in their school community sustainable, high-performance and "green". The site was originally created for members of the Runnymede Public School community in the west-end of Toronto, but has expanded. This blog is owned and maintained by Marshall Leslie (see www.mleslie.com). You can also follow us on Twitter @greenschools_ca

October 2017
Sun Mon Tue Wed Thu Fri Sat
<< < Current > 
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

Search

Misc

XML Feeds

What is RSS?

Who's Online?

  • Guest Users: 18

powered by
b2evolution