Post details: A new elementary school in Cambridge, Mass., aims at being a pilot for that city’s NZE commitment

10/30/17

Permalink 02:53:37 pm, by mleslie Email , 94 words, 22 views   English (US)
Categories: News Updates

A new elementary school in Cambridge, Mass., aims at being a pilot for that city’s NZE commitment

by John Caulfield, Building Design & Construction- October 28, 2017 - The first Net Zero Emissions school, and the largest NZE building of any type, in Massachusetts is under construction in East Cambridge. In collaboration with William Rawn Associates, Boston-based architectural firm Arrowstreet has designed this 270,000 -sf building, which will house King Open School for grades K-5 and Cambridge Street Upper School for grades 6-8. The schools will have separate entrances as well as their own academic, physical education, and administrative facilities, but will share common spaces that will include the media center, cafeteria, and auditorium.

Green School News

This news page has useful information for school communities about efforts to make buildings and schoolyards sustainable, high-performance and "green".

December 2017
Sun Mon Tue Wed Thu Fri Sat
<< <     
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

Search

Categories

Misc

XML Feeds

What is RSS?

Who's Online?

  • Guest Users: 2

powered by
b2evolution